CHEMPLAST - ETHYLENE STORAGE TERMINAL PROJECT
Project Highlights
- Project : Ethylene Storage Terminal Facility including Marine piping & Unloading arm.
- TPIL Scope: Basic & detailed Engineering, Procurement, Construction (except Civil works for Marine portion), precommissioning and commissioning assistance
- EDC : 6th October 2004
- Completion Status:
Plant area : Nearing completion
Marine Corridor: Awaiting work front release from Customer to start the work
Salient Features
- Marine Unloading Arm
- 1300 metres of Unloading line on the marine structure
- 1300 metres pipeline from sea--fall point to the tank terminal
- Double wall double integrity storage tank of 9% Ni steel material at atmospheric pressure and at Minus 104 Deg C
- Low pressure and High pressure Compressor System for Unloading and holding Boil Off duty
- Pre--cooling and Send out Pumps & Vaporizer by direct heating by Methanol
Critical Activities
- Civil Design of Tank foundation
- Completion of Civil foundation
- Ordering and receipt of 9% Ni Steel material at site
- Mechanical Erection of Tank
- Unloading arm - receipt and erection at Jetty
- Hydro--testing of Tank
- Pre--commissioning and filling of insulation
- Availability of Jetty and Marine structures
ONGC - GAS COLLECTION STATION
- Client : Southern Petrochemical Industries Corporation Limited, India
- Project description: 2.5 MM Cu.m per day - Gas Collecting Station (GCS)
for ONGC, Karaikal, India
- Scope of Work: Design Engineering, Procurement, nstallation, Pre-commissioning and Commissioning of GCS at Ramnad along with accompanying offsites & utilities
- Contract Schedule: 12 Months
- Special Features:
- Total wells connected to this GGS: 15
- 3 phase separation to separate Gas, Oil and Water at two different pressure levels
- Treatment of separated water before disposal
- Flare System
- Instrument air system and DCS
NIKO RESOURCES - DEW POINT CONTROL UNIT
- Client : Niko Resources Limited, Baroda, India
- Project description: 5.6 MM Cu.m per day - Dew Point Control Unit (DPCU) at Hazira for Niko Resources Limited, India
- Scope of Work: Design Engineering, Procurement, Supply, Installation, Pre-commissioning and Commissioning of DPCU including Propane refrigeration system (free issue material), Cold Separators, Glycol Recovery System and Propane Storage Facility
- Contract Schedule: 14 Months
- Special Features:
- Project executed inside an operating Plant by following excellent safety norms
- Integration with existing separation facility & flare system and Control system
Q-CHEM PROJECT
- Client : Technip, Italy
- Project : (for Q-Chem, Qatar)
- Ethylene Unit - 500,000 T/Y
- 1-Hexene Unit - 47,000 T/Y
- Polyethylene Unit - 462,000 T/Y
- Feed Gas Treatment & Sulphur Recovery Unit
- Offsite & Utilities
- Licensors:
- Ethylene - Kellogg Brown & Root
- Polyethylene - Phillips Petroleum
- 1-Hexene - Phillips Petroleum
- Services: Detail Engineering for Civil, Piping, Electrical & Instrumentation for Polyethylene, Offsite & Utility Units
- Total Project manhours executed by TPIL ~ 135,000.
-
Disciplinewise manhours consumed:
Piping: 70,000
Civil & structural: 26,000
Electrical: 15,000
Instrumentation:18,000
Project mgmt & others: 5,000
- Project Start Date: March 2000
Project Completion Date:November, 2001
Key Facts
- Multi-centered Project Execution Philosophy:
- Simultaneous execution of work in 4 operating centers viz.,Houston, Mexico, Paris and Chennai with electronically integrated networking.
- Discipline-wise Details:
- Piping (2100 Lines, ~ 4000 Isometric sketches)
- Civil (~350 Drawings)
- Electrical (700 LV Users, 60 MV Users)
- Instrumentation (3200 I/O Signals, 400 Control Valves)
-
Major Software Used:
- PDS (INTERGRAPH) - 3D modelling of pipelines
- TRIFLEX - Piping stress analysis
- STAAD III - Structural calculation
- INTOOLS - Loop diagrams
- INSTRUCALC-Design of control valves
OMIFCO PROJECT
- Client : Technip, France
- Project : 2 X 2530 TPD Urea Plant for Oman India Fertiliser Co, Oman (JV of Oman Oil Co, KRIBHCO, IFFCO, INDIA)
- Services : Detailed Engineering in Civil, Piping, Electrical & Instrumentation disciplines.
- Contract Schedule: 14 Months
- Total Project manhours executed by TPIL ~ 150,000.
- Disciplinewise manhours break-up:
civil - 34000
piping - 81000
electrical - 14000
instrumentation-11,000
project mgmt & others -10000
- Project Start Date:September 2002
Project Completion Date: January 2004
Key Facts
- Scope of work includes front end engineering design of urea plant
- Discipline-wise Details:
- Piping (~ 3500 Lines )
- Structural Steel Tonnage - 3000 MT
- Electrical (350 Users)
- Major Software Used:
- PDS - Pipeline Modelling, Structural Work Drawings
- Foundation 3D, MAT 3D - Civil Foundation Design
- CEASER LI & FE PIPE- Stress Analysis
- FE PIPE - Stress Analysis
- STAAD LII - Structural Calculation
- DRAWIZ - Gad Preparation
- PICOM - Piping MTO
- PELICON FORGE - Supports Modelling
DHC PROJECT - GONFREVILLE
- Client : Technip, France
- Project : 2.4 MTPA Distillate Hydro cracker unit in France for TOTAL, France
- Services : FEED, Detailed Engineering in Mechanical, Civil, Piping, Electrical & Instrumentation disciplines.
- Total Project manhours to be executed by TPIL ~ 133,000.
- Disciplinewise Manhours Break-up:
Mechanical - 8,300
Piping - 73,200
Civil - 28,000
Electrical - 6,400
Instrumentation - 7,800
Project Mgmt & Others - 9,300
- Project Start Date: December 2003
Project Completion Date: April 2005
Key Facts
- Discipline-wise Details:
- Piping (~ 1300 Lines )
- Civil (300 Drawings)
- Electrical (240 LV Users, 10 MV Users)
- Instrumentation (2500 I/O counts)
- Major Software Used:
- PDS - xEquipment & Pipeline Modelling
- STAAD III - Structural Calculation
- CEASER II - Stress Analysis
- FRAMEWORKS PLUS - Civil & Structural Works Modelling
- PELICAN FORGE - Piping Support Modelling
- CANECO - Cable List And Cable Sizing
|